Project Description
				
				
									The Meteor Systems’ facility features a 22,000 ft² warehouse and manufacturing space with a 3,000 ft², two-storey office building with a structural steel frame and curtain wall system. The design includes an eye-catching live green wall, contributing to the building’s sustainability. Originally an existing pre-engineered structure, the facility was expanded to include a double-wide loading dock and modern office space, blending functionality with contemporary design.								
				
					
Other Project Data
				
		
				
									Principal Architect: Paul Weidl								
				
									Project Manager: Nadine Chong								
				
									Location: 419 Seacliff Dr E, Leamington								
				
									Project Status: Proposed								
				
									Project Year: 2016								
				
									Project Budget: Undisclosed								
				
									Services Provided: Planning, Architecture, Civil, Engineering, and Landscape